Floating Production Intelligence

Floating Production Intelligence

  • Annual five year outlook and forecast FPSO database - The online database is updated every day – with information direct from primary sources. In the database are details for 200+planned projects, 390+ installations in service, 40+ floaters on order and 40+ floaters available. The database is fully searchable. Customized charts and spreadsheets can be directly produced from the database. Data are easily exported to excel spreadsheet.

Order Now!

Request a Demo
BW Offshore Logo

Headquarter

BW Offshore Norway Drammensveien 149
Oslo277
Norway
+47 2313 0000

BW Offshore to Fully Own FPSO Petroleo Nautipa 7/24/2014 10:10:20 PM

Following to BW Offshore's announcement of 9 July 2014, BW Offshore has signed a sale and purchase agreement with Yinson to take 100% ownership of the FPSO Petroleo Nautipa, owned through Tinworth Pte. Ltd. Tinworth, and correspondingly the FPSO…

BW Offshore Acquires VLCC from DSME 1/2/2014 4:48:55 PM

BW Offshore has exercised an option to acquire the tanker Blue Opal for USD 83.4 million from Daewoo Shipbuilding & Marine Engineering (DSME). Blue Opal is a DSME designed and built VLCC (320,000 dwt) from 2012. BW Offshore has performed detailed…

Kongsberg to Supply FPSO Safety System 8/28/2014 10:54:14 AM

Kongsberg Maritime Engineering (KME), the wholly owned Engineering, Procurement and Construction (EPC) subsidiary of global maritime technology developer Kongsberg Maritime, will deliver an Integrated Control and Safety System for the new BW Offshore Catcher FPSO.

Brazil FPSO Shifts to Field Location 8/25/2013 11:28:29 PM

The P-63 platform-vessel, with the capacity to process 140,000 barrels of oil per day and to compress one million cu.m of gas per day, has been towed  from a temporary location in Ilha de Santana, in Macaé (RJ) to the Papa-Terra field in the post-salt Campos Basin.

BW Offshore Completes $800m Bank Loan 8/5/2014 3:24:10 PM

BW Offshore has signed the facility documentation for the new $800 million 10-year senior secured credit facility for the Catcher FPSO project.e facility is a combined construction and long term financing facility. The credit facility was substantially…