Floating Production Intelligence

Floating Production Intelligence

  • Annual five year outlook and forecast FPSO database - The online database is updated every day – with information direct from primary sources. In the database are details for 200+planned projects, 390+ installations in service, 40+ floaters on order and 40+ floaters available. The database is fully searchable. Customized charts and spreadsheets can be directly produced from the database. Data are easily exported to excel spreadsheet.

Order Now!

Request a Demo
BW Offshore Logo

Headquarter

BW Offshore Norway Drammensveien 149
Oslo277
Norway
+47 2313 0000

BW Offshore Completes $800m Bank Loan 8/5/2014 3:24:10 PM

BW Offshore has signed the facility documentation for the new $800 million 10-year senior secured credit facility for the Catcher FPSO project.e facility is a combined construction and long term financing facility. The credit facility was substantially…

BW Offshore: VLCC Acquired for Future Projects 1/3/2014 3:27:51 PM

BW Offshore announced that it has exercised an option to acquire the tanker Blue Opal for $83.4 million from Daewoo Shipbuilding & Marine Engineering (DSME). Blue Opal is a DSME designed and built VLCC (320,000 dwt) from 2012. BW Offshore has…

Drydocks World Send Off First Shell Prelude Turret Module 9/26/2013 4:29:49 AM

The first module, the bogie support structure, standing 22 metres high, with a diameter of 30 metres and weighing 1300 tonnes will be transported to Korea to integrate with the Prelude FLNG vessel. Other modules will soon follow. The Prelude…

BW Offshore Extend FPSO Nigerian Contracts 4/8/2013 4:12:12 AM

BW Offshore has agreed an extension for their FPSO's 'Abo' and ''. The extension for Abo is with Nigerian Agip Exploration Ltd of nine months. and for Sendje Berge with Addax Petroleum Exploration Ltd of three months. These extensions have been…

Brazil FPSO Shifts to Field Location 8/25/2013 11:28:29 PM

The P-63 platform-vessel, with the capacity to process 140,000 barrels of oil per day and to compress one million cu.m of gas per day, has been towed  from a temporary location in Ilha de Santana, in Macaé (RJ) to the Papa-Terra field in the post-salt Campos Basin.